PROJECT DETAILS
INDU’127
SEDESPA. TABASCO. GOVERNMENT STATE BRIGE
(CONTEST No. SEDESPA-DOP-06/99) CONTRACT No. SEDESPA-DOP-06/99. CONSTRUCTION OF THE BRIDGE UNDERPASS AT THE INTERSECTION OF AV. RUIZ CORTINES AND PERIFERICO CARLOS PELLICER CAMARA VILLAHERMOSA, TAB, INCLUDES; DEEP FOUNDATIONS OF BASE CONCRETE PILES, CIVIL WORKS IN FOUNDATIONS, HEADS AND SUPERSTRUCTURE, FABRICATION AND ASSEMBLY TYPE 13 INTERLOCKS AASHTO POSTENZADAS TO COVER CLEAR 40 M.L. X 1.83 M CAMBER, MANUFACTURING AND ASSEMBLY TYPE 26 INTERLOCKS AASHTO POST-TENSIONINGTO COVER CLEAR 16 M.L. X 1.35 M CAMBER, MANUFACTURE AND ASSEMBLY OF 5,000 M2 OF CONCRETE FLAKES (PREFORMED LAND), EMBANKMENTS APPROACHES, HYDRALIC BASES, ASPHALT PAVEMENT BINDER, CURBS, SIDEWALKS, STREETLIGHTS, MARKING AND ADDITIONAL WORKS.
AÑOS.
1999
http://www.indusaconstrucciones.com/index.php/en/projects/92-idusa/projects/257-indu-127-ingles.html#sigFreeIdb0aa1d26d9